PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing safety cables and poles at Derrick -3 (2nd Floor) Facing North (800x600).jpg Backfilling and compacting underground piping at Rahway Ave. Facing the new Building (800x600).jpg Installing rebar mats at Stair -4 (3rd Floor) Facing North-East (800x600).jpg Installing Stair frames at Stair -5 Facing West (800x600).jpg Installing underground sanitary piping at Room 105 (Servery) Facing North-West (800x600).jpg Saw cut Rahway Ave. past the bridge Facing the new Building (800x600).jpg Underground piping Facing Administration building (800x600).jpg
Previous pageNext page Installing underground sanitary piping at Room 105 (Servery) Facing North-West (800x600)
Installing underground sanitary piping at Room 105 (Servery) Facing North-West (800x600)